ACHIEVEMENTS (MoU signed)

The Department has focused to develop huge coal deposits of the province to meet the future energy need and has so far achieved signing of the following MOU’s with local and foreign joint investors:

1.  M/s. AES Oasis Limited for establishment of 1000 MW coalfired power plant
    at Thar, in pursuance of Bankable Feasibility Study of Thar Coal Mining.

2.  M/s. Ukrinterenergo of Ukraine: In process for feasibility study of Coal 
    Washing Plant of 1.0 million tons coal annually.
3.  M/s. China National Machinery Import & Export Corporation of China
   
(CMC) for 250 MW integrated coal mining and coalfired power generation
    plant at Sonda-Jherruck in district Thatta.

4.  M/s. Dadabhoy for establishment of 200 MW coalfired power plant at
    Sonda-   Jherruck in district Thatta.

5.  M/s. Soneri Energy (Pvt) Limited is in process of assessment of the Coal
    
Bed Methane, coal and physically associated substances and coal by-  
     products.
6.  MoU signed with Associated Group for 2X250 MW Thar Block-IV.
7.  Setting-up of Three Reverse Osmosis Plant at Thar.
8.  Two new coal blocks have been added to the existing blocks in Thar.

AREAS FOR PRIVATE INVESTMENT
1.      Coal Mining
2.      Mine mouth Power Generation based on Thar coal.
3.      Coal Briquetting and Pulverization.
4.      Coal Washing.
5.      Coal Gasification .
6.      Export/Sale of Power – Thar Coal through Private Sector.
7.      Granite Mining.
8.      Coal Bed Methane Gasification.
9.      China Clay.

INCOME FROM MINERALS

YEAR AMOUNT (RS. IN MILLION)
2004-05 300.810
2005-06

310.000 (Expected by end of June, 2006)

INFRASTRUCTURE AT THAR COALFIELD.
1. Electricity : 11 kV feeder emanating from Islamkot Grid Station to Thar
    Coal Project with 200 watts transformer and energized.
2. 500 kV Transmission Line : Alignment of 500 kV transmission line has been  
    finalized by WAPDA.
3. Telephone : Optical fiber cable laying/installation of system between  >
    Mirpurkhas to Mithi exchanges completed. 100’ high guide tower (1”dia) is
    to be installed at Thar coal site with DRS equipment. Telephone facility is 
    available upto Islamkot.
4. Water Supply : Water supply line from Mithi to Islamkot and Islamkot to
    coal mines (Thario Halepota) has been completed and water reservoir of
    6  lac gallons is available at coal mine site. 03 lac gallons/day will be
    available at site (Block-II).
5. Railway Line : Pakistan Railway conducted feasibility study of railway line
    at Thar coalfield to facilitate transportation of coal equipment. The railway 
    route has been approved by the Chief Minister, Sindh.
6. Town Planning of Islamkot : Town Planning of Islamkot nearest town to
    coalfield has also been sponsored for rehabilitation/resettlement of the
7  Displaced population will be relocated by providing them all necessary
    facilities in the nearest township.

Thar Lodge : The scheme for construction of 20 bedded accommodation to facilitate foreign and local investors at Islamkot has been approved at an estimated cost of Rs.40.978 million. Construction is in progress.

 

 

 