PROJECTS:
Revamping/Rehabilitation Of Irrigation And
Drainage Systems In Sindh
The
main objectives of the project is to improve the
operational efficiency of irrigation water
ensuring the safety of the canal systems and
delivering equitable assured share of water to
the farmers at the tails reaches of the canal
with adequate drainage cover in the order to
boost up the national economy to alleviate the
poverty in rural area of Sindh and ensure
delivery of drinking water to urban area of the
province. Works of the project are in full swing
and up to date progress is 55%.
Right
Bank Outfall Drain (RBOD)
The
project of Right Bank Outfall Drain (RBOD) is
under construction from Sehwan to sea. The
project is being supported and monitored by 5
Corps Engineers. The project after completion
will provide the facility to carry out the
drainage effluent of Sindh and Balochistan
Provinces from Karampur to sea at Gharo Creek.
The works of the scheme are in full swing. After
completion of this project pollution of Malir
Lake will stop.
Lining
Of Distributaries And Minors
The
project costing Rs.12445 million is sanctioned
by the Federal Government for 514 numbers,
irrigation channels having a discharge carrying
capacity of 200 cusecs are to be lined in the
perennial and non – perennial canal commanded
areas of the Gudu, Sukkur and Kotri Barrages.
About 822,876 acres more area is expected to be
irrigated by saving 3491 cusecs water after
lining of channels. Consultants have been
engaged and execution of works has also been
commenced.
Works
Of Chotiari Reservoir Under PSDP
The
following remaining works of Chotiari Reservoir
are under execution through this department: -
|
(i) |
Construction of 2 fall structures on
Nara Canal at RD 335 and 460 re –
sectioning of Ranto Canal RD 0 to 72 and
strengthening of NIP of Jamrao Canal
mile 17 to 49. |
Rs.1086 |
|
|
|
|
|
(ii) |
Construction of Makhi Farash Link Canal
Project (Chotiari Phase – II). |
Rs.2037 |
|
(iii) |
Installation of 100 tube wells of saline
water around Chotiyaroon. |
Rs.192 |
|
|
|
|
|
(iv) |
Recouping deficiencies along Chotiari
Reservoir. |
Rs.305 |
After
the execution of above schemes the Chotiari
Reservoir will be filled up to required capacity
and its benefits will be accrued by providing
additional water to 324,000 acres of land in
districts Sanghar and Umerkot through
construction of Makhi Farash Link Canal
including remodelling of off taking canals from
Nara Canal at Farash Regulator.
Small Storage Dam
The
objective of the sector/sub sector is
infrastructure development in water conservation
and to achieve a sustained increase in the
potential of surface as well as groundwater
reservoirs intended to be exploited for domestic
water supply and agriculture for the hard
pressed habitants of hilly Kohistan Region and
Nagarparkar.
Village
Electrification Programme
Ø
Cost of scheme
under ADP 2007 – 08 Rs.800 million.
Ø
Work orders
issued to HESCO for 902 villages at cost of
Rs.749 million.
Ø
HESCO reported
that up to April 2008, 497 villages been
electrified and 391 are under progress. |